Thursday, April 18, 2019

Sheet Pile Design Coursework Example | Topics and Well Written Essays - 2000 words

Sheet Pile Design - Coursework ExampleThe latter is caused by nation pressures hit the limiting state on both side of a considered retaining structure, which thereafter moves towards the excavated area until the full-zone failure is reached. As movement lowlife occur on the bottom part of the groyne, the analysis of the structure will be taken as a spare body. Thus there will be modified free earth clog method (The free earth support revised method) and fixed earth support method. It is worth mentioning that both methods have assumed that active stress condition have been fully authentic behind the retaining wall while the passive stress is right in front of the structure. This will depart for calculation using coulomb or Boussinesq theories that consider the actual stress distribution. 1. Modified free earth support method of analysis According to Clayton et al (1993, pp213-214), this method often gives the most economical flesh for retaining walls. For structure such as ca ntilever wall, the soil at the lower part of the pile should be strong enough to resist overturning bits. As shown in the above figure, the passive zone should be comme il faut in order to prevent lateral deflection and whirling at the lower end of the wall. However, the primary(prenominal) principle behind the modified free earth support method of analysis is the assumption that the embedment of the wall is allowed to move and this will be to a certain distance under the action of the applied lateral earth pressure this will cause the occurrence of negative bending moments at the considered location. This ends in a statically determinate structure, only stable under certain conditions. Therefore, if a cantilever wall is to be designed based on this analysis, only the external passive and active forces will be considered. For the fact that the originator will not be sufficient to cancel out the latter, in case of large and uplifted retaining structures no equilibrium will be meet. This will be because no fixity has been assumed at the bottom of the pile, as a consequence the structure will be under mechanism. When the structure has a height great than 3m, this will not be the ideal design as the negative moment at the bottom of the file will increase with respect to height (increase of the active stress). As a consequence, to achieve equilibrium, strut or anchor must be added in the design. The addition will primed(p) at the top of the structure, as shown in the picture below, to cancel out the negative moment at the base. Hence, the number of anchor will be directly proportional to the height of the wall. (Delattre, 2001,p3) When anchor or get is added, the bending moment diagram of the wall will be as shown in the picture below. It can be seen that when moment is created by the anchorage at the top, at the bottom of the pile, the negative moment has been sour out this will be only if both are equal or the former is greater than the overturning mo ment. As a consequence equilibrium has been satisfied a moment created by the tie is fit by the active earth pressure above it. Lancellotta (1995, pp305) explained the failure mechanism envisaged in this case involves a rotation about the anchor. Here, the rotation of moment at C (shown in the above picture) will enable for calculating the depth by which the pile has to be embedded to satisfy equilibrium against rotation in other words, the shear strength of the soil is mobilised with respect to the depth of embedment. The equilibrium of horizontal exposition gives then the force of the anchor as a high anchorage force will result in movement of the pile

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.